Rüzgâr tarlası
|
Lokasyon
|
Saha Koordinatları
|
Kapasite(MW)
|
Türbin adetleri ve modeller
|
İşletmeye Alınma
Tarihi
|
Kaynak
|
Hornsea 1
|
Birleşik Krallık
|
53°53′06″N 1°47′28″E / 53.885°K 1.791°D / 53.885; 1.791 (Hornsea 1)
|
1,218
|
174 x Siemens SWT-7.0-154
|
2019
|
|
Walney Extension
|
Birleşik Krallık
|
54°5′17″K 3°44′17″B / 54.08806°K 3.73806°B / 54.08806; -3.73806 (Walney Extension)
|
659
|
40 x MHI-Vestas 8.25 MW
47 x Siemens Gamesa 7 MW
|
2018
|
|
London Array
|
Birleşik Krallık
|
51°38′38″K 01°33′13″D / 51.64389°K 1.55361°D / 51.64389; 1.55361 (London Array)
|
630
|
175 × Siemens SWT-3.6-120
|
2013
|
|
Gemini Wind Farm
|
Hollanda
|
54°2′10″K 05°57′47″D / 54.03611°K 5.96306°D / 54.03611; 5.96306 (Gemini Wind Farm)
|
600
|
150 × Siemens SWT-4.0
|
2017
|
|
Beatrice
|
Birleşik Krallık
|
58°7′48″K 3°4′12″B / 58.13000°K 3.07000°B / 58.13000; -3.07000 (Beatrice Wind Farm)
|
588
|
84 × Siemens SWT-7.0-154
|
2019
|
|
Gode Wind (phases 1+2)
|
Almanya
|
54°04′K 7°02′D / 54.067°K 7.033°D / 54.067; 7.033 (Gode Wind I+II)
|
582
|
97 x Siemens SWT-6.0-154
|
2017
|
|
Gwynt y Môr
|
Birleşik Krallık
|
53°27′00″K 03°35′00″B / 53.45000°K 3.58333°B / 53.45000; -3.58333 (Gwynt y Môr)
|
576
|
160 × Siemens SWT-3.6-107
|
2015
|
|
Race Bank
|
Birleşik Krallık
|
53°16′K 0°50′D / 53.267°K 0.833°D / 53.267; 0.833 (Race Bank)
|
573
|
91 x Siemens SWT-6.0-154
|
2018
|
|
Greater Gabbard
|
Birleşik Krallık
|
51°52′48″K 1°56′24″D / 51.88000°K 1.94000°D / 51.88000; 1.94000 (Greater Gabbard wind farm)
|
504
|
140 × Siemens SWT-3.6-107
|
2012
|
|
Hohe See
|
Almanya
|
|
497
|
71 x Siemens SWT-7.0-154
|
2019
|
|
Borkum Riffgrund 2
|
Almanya
|
53°57′7″K 6°29′17″D / 53.95194°K 6.48806°D / 53.95194; 6.48806 (Borkum Riffgrund 2)
|
450
|
56 x MHI Vestas V164-8.0 MW
|
2019
|
|
Horns Rev 3
|
Danimarka
|
55°49′K 7°42′D / 55.817°K 7.700°D / 55.817; 7.700 (Horns Rev 3)
|
407
|
49 x MHI Vestas V164-8.3 MW
|
2019
|
|
Dudgeon
|
Birleşik Krallık
|
53°14′56″K 1°23′24″D / 53.24889°K 1.39000°D / 53.24889; 1.39000 (Dudgeon Offshore Wind Farm)
|
402
|
67 × Siemens SWT-6.0-154
|
2017
|
|
Veja Mate
|
Almanya
|
54°19′1″K 5°52′15″D / 54.31694°K 5.87083°D / 54.31694; 5.87083 (Veja Mate Wind Farm)
|
402
|
67 × Siemens SWT-6.0-154
|
2017
|
|
Anholt
|
Danimarka
|
56°36′00″K 11°12′36″D / 56.60000°K 11.21000°D / 56.60000; 11.21000 (Anholt Offshore Wind Farm)
|
400
|
111 × Siemens SWT-3.6-120
|
2013
|
|
BARD Offshore 1
|
Almanya
|
54°22′0″K 5°59′0″D / 54.36667°K 5.98333°D / 54.36667; 5.98333 (BARD Offshore 1)
|
400
|
80 × BARD 5.0MW
|
2013
|
|
Global Tech I
|
Almanya
|
54°30′00″K 6°21′30″D / 54.50000°K 6.35833°D / 54.50000; 6.35833 (Global Tech I)
|
400
|
80 × Areva Multibrid M5000 5.0MW
|
2015
|
|
Rampion
|
Birleşik Krallık
|
50°40′K 0°06′B / 50.667°K 0.100°B / 50.667; -0.100 (Rampion)
|
400
|
116 x MHI Vestas V112-3.45 MW
|
2018
|
|
Binhai North
|
Çin
|
34°40′04″K 120°21′29″D / 34.66778°K 120.35806°D / 34.66778; 120.35806 (Binhai North Wind)
|
400
|
100 x Siemens SWT-4.0-120
|
2018
|
|
Merkur
|
Almanya
|
|
396
|
66 x GE Haliade 150-6 MW
|
2019
|
|
West of Duddon Sands
|
Birleşik Krallık
|
53°59′02″K 3°27′50″B / 53.98389°K 3.46389°B / 53.98389; -3.46389 (West of Duddon Sands)
|
389
|
108 × Siemens SWT-3.6-120
|
2014
|
|
Arkona
|
Almanya
|
|
385
|
60 x Siemens SWT-6.0-154
|
2019
|
|
Norther Offshore Wind Farm
|
Belçika
|
|
370
|
44 × Vestas V164-8.4 MW
|
2019
|
|
Walney
(phases 1&2)
|
Birleşik Krallık
|
54°02′38″K 3°31′19″B / 54.04389°K 3.52194°B / 54.04389; -3.52194 (Walney Wind Farm)
|
367
|
102 × Siemens SWT-3.6-107
|
2011 (phase 1)
2012 (phase 2)
|
|
Galloper
|
Birleşik Krallık
|
51°52′48″K 1°56′24″D / 51.88000°K 1.94000°D / 51.88000; 1.94000 (Galloper)
|
353
|
56 x Siemens SWT-6.0-154
|
2018
|
|
Wikinger
|
Almanya
|
54°50′2″K 14°4′5″D / 54.83389°K 14.06806°D / 54.83389; 14.06806 (Wikinger Wind Farm)
|
350
|
70 × Adwen AD 5-135
|
2018
|
|
Nordsee One
|
Almanya
|
53°58′0″K 06°48′00″D / 53.96667°K 6.80000°D / 53.96667; 6.80000 (Nordsee One Wind Farm)
|
332
|
54 × Senvion 6.2M126
|
2017
|
|
Thorntonbank
(phases 1–3)
|
Belçika
|
51°33′00″K 2°56′00″D / 51.55000°K 2.93333°D / 51.55000; 2.93333 (Thorntonbank phases 1&2&3)
|
325
|
6 × Senvion 5MW
48 × Senvion 6.15MW
|
2009 (phase 1)
2012 (phase 2)
2013 (phase 3)
|
|
Sheringham Shoal
|
Birleşik Krallık
|
53°7′0″K 1°8′0″D / 53.11667°K 1.13333°D / 53.11667; 1.13333 (Sheringham Shoal Offshore Wind Farm)
|
315
|
88 × Siemens SWT-3.6-107
|
2012
|
|
Borkum Riffgrund 1
|
Almanya
|
53°58′0″K 06°33′00″D / 53.96667°K 6.55000°D / 53.96667; 6.55000 (Borkum Riffgrund 1 Wind Farm)
|
312
|
78 × Siemens SWT-4.0-120
|
2015
|
|
Rentel
|
Belçika
|
|
308.7
|
42 x Siemens SWT-7.0-154
|
2019
|
|
SPIC Jiangsu Dafeng
|
Çin
|
33°30′50″N 121°06′18″E / 33.514°K 121.105°D / 33.514; 121.105
|
302.4
|
72 × Envision 4.2MW
|
2018
|
|
Dongtai Four
|
Çin
|
|
302.4
|
63 x Siemens SWT-4.0-130
10 x Envision EN136/4.2 MW
|
2019
|
|
Amrumbank West
|
Almanya
|
54°30′0″K 07°48′00″D / 54.50000°K 7.80000°D / 54.50000; 7.80000 (Amrumbank West Wind Farm)
|
302
|
80 × Siemens SWT-3.6-120
|
2015
|
|
Thanet
|
Birleşik Krallık
|
51°26′0″K 01°38′0″D / 51.43333°K 1.63333°D / 51.43333; 1.63333 (Thanet Offshore Wind Project)
|
300
|
100 × Vestas V90-3.0MW
|
2010
|
|
Huaneng Rudong
|
Çin
|
32°40′48″N 121°19′23″E / 32.680°K 121.323°D / 32.680; 121.323 (Huaneng Rudong)
|
300
|
38 x Siemens 4.0MW
19 x Haizhuang 5MW (H154)
1 x Haizhuang 5MW (H171)
12 x Envision 4.2MW (EN-136)
|
2017
|
|
Jiangsu Longyuan Chiang Sand
|
Çin
|
32°48′58″N 121°30′58″E / 32.816°K 121.516°D / 32.816; 121.516 (Huaneng Rudong)
|
300
|
75 x Envision EN136/4.0 MW
|
2018
|
|
Nordsee Ost
|
Almanya
|
54°26′00″K 7°41′00″D / 54.43333°K 7.68333°D / 54.43333; 7.68333 (Nordsee Ost)
|
295
|
48 × Senvion 6.15MW
|
2015
|
|
Butendiek
|
Almanya
|
54°54′0″K 07°45′00″D / 54.90000°K 7.75000°D / 54.90000; 7.75000 (Butendiek Wind Farm)
|
288
|
80 × Siemens SWT-3.6-120
|
2015
|
|
DanTysk
|
Almanya
|
55°9′00″K 7°10′30″D / 55.15000°K 7.17500°D / 55.15000; 7.17500 (DanTysk)
|
288
|
80 × Siemens SWT-3.6-120
|
2015
|
|
Baltic 2
|
Almanya
|
54°58′24″K 13°10′40″D / 54.97333°K 13.17778°D / 54.97333; 13.17778 (Baltic 2)
|
288
|
80 × Siemens SWT-3.6-120
|
2015
|
|
Meerwind Süd / Ost
|
Almanya
|
54°23′00″K 7°42′00″D / 54.38333°K 7.70000°D / 54.38333; 7.70000 (Meerwind Süd / Ost)
|
288
|
80 × Siemens SWT-3.6-120
|
2015
|
|
Sandbank (Phase 1)
|
Almanya
|
55°11′0″K 06°51′00″D / 55.18333°K 6.85000°D / 55.18333; 6.85000 (Sandbank Wind Farm)
|
288
|
72 × Siemens SWT-4.0-130
|
2017
|
|
Lincs
|
Birleşik Krallık
|
53°11′00″K 00°29′00″D / 53.18333°K 0.48333°D / 53.18333; 0.48333 (Lincs Wind Farm)
|
270
|
75 × Siemens SWT-3.6-120
|
2013
|
|
Burbo Bank Extension
|
Birleşik Krallık
|
53°28′48″K 3°15′36″B / 53.48000°K 3.26000°B / 53.48000; -3.26000 (Burbo Bank Extension)
|
258
|
32 × Vestas V164-8.0MW
|
2017
|
|
Liuheng (Guodian Zhoushan Putuo)
|
Çin
|
|
252
|
63 × Siemens SWT-4.0-130
|
2019
|
|
Humber Gateway
|
Birleşik Krallık
|
53°38′38″K 0°17′35″D / 53.64389°K 0.29306°D / 53.64389; 0.29306 (Humber Gateway)
|
219
|
73 × Vestas V112-3.0MW
|
2015
|
|
Northwind
|
Belçika
|
51°37′08″K 02°54′03″D / 51.61889°K 2.90083°D / 51.61889; 2.90083 (Northwind)
|
216
|
72 × Vestas V112-3.0MW
|
2014
|
|
Westermost Rough
|
Birleşik Krallık
|
53°48′0″K 0°9′0″D / 53.80000°K 0.15000°D / 53.80000; 0.15000 (Westermost Rough Wind Farm)
|
210
|
35 × Siemens SWT-6.0-154
|
2015
|
|
Horns Rev 2
|
Danimarka
|
55°36′00″K 7°35′24″D / 55.60000°K 7.59000°D / 55.60000; 7.59000 (Horns Rev 2)
|
209
|
91 × Siemens SWT-2.3-93
|
2009
|
|
Rødsand II
|
Danimarka
|
54°33′0″K 11°42′36″D / 54.55000°K 11.71000°D / 54.55000; 11.71000 (Nysted Wind Farm)
|
207
|
90 × Siemens SWT-2.3-93
|
2010
|
|
Chenjiagang (Jiangsu) Xiangshui
|
Çin
|
34°29′00″K 119°52′00″D / 34.48333°K 119.86667°D / 34.48333; 119.86667 (Jiangsu Xiangshui Wind Farm)
|
201
|
134 × FD77-1500 Dongfang Electric
|
2010
|
|
Trianel Borkum West II (Phase 1)
|
Almanya
|
54°2′30″K 6°28′0″D / 54.04167°K 6.46667°D / 54.04167; 6.46667 (Trianel Borkum West II)
|
200
|
40 × Areva Multibrid M5000 5.0MW
|
2015
|
|
Jiangsu Luneng Dongtai
|
Çin
|
32°55′16″K 121°10′55″D / 32.92111°K 121.18194°D / 32.92111; 121.18194 (Jiangsu Luneng Dongtai Wind Farm)
|
200
|
50 × Siemens SWT-4.0-130
|
2017
|
|